Know what your weight is made of. Then change it.
Stand on Everhale for 20 seconds. It measures fat and muscle in each arm, each leg and your trunk. Tell it your goal, and the app turns that scan into today's plan: how much to eat, how much protein, how long to walk and which workout to do.
Launching first in New Zealand. No account needed: your readings stay on your phone.
- 8electrodes, hands and feet
- 5body segments measured
- 49health factors tracked
- 12,000+foods and dishes, from kumara to ghormeh sabzi
- 1plan, rebuilt every weigh-in

The number on the scale is the least interesting one.
Train well and eat well, and your weight can sit still for weeks while you lose fat and gain muscle. A normal scale calls that a plateau. Everhale shows the progress underneath, so you keep going instead of giving up in week three.
Illustration of a twelve-week strength block. Not real customer data.
Three steps, every morning.
-
Step on
Bare feet on the plate, hands on the bar. Twenty seconds later your phone shows weight, body fat, muscle and visceral fat, plus fat and muscle for each arm, each leg and your trunk.
-
Set a goal you can actually hit
Pick lose fat, tone up, build muscle, look and feel younger, get fitter, or feel like yourself again after a baby. Everhale suggests a safe target and a real date, and tells you how much change per week that means.
-
Follow today's plan
Calories, protein, a brisk walk with minutes and pace, your fasting window and today's workout. Weigh in again and the plan updates itself.
Five readings, not one.
Hands and feet close eight contact points, so Everhale reads each arm, each leg and your trunk separately. Colours show where you carry fat and where you're building muscle. If your left side lags, the Gym plan gives it extra work.
Trunk
Example reading. Most people carry extra fat around the middle first, and lose it there last.
49 health factors. One number you'll want to lower.
Everhale combines your scan with your steps, sleep, food and training into 49 factors, each checked against WHO and New Zealand guidelines. They add up to your Health Age: an estimate of how old your habits make your body. Walk more, sleep better, lose some belly fat, and watch it fall.
- Every factor shows healthy, close or work on it, with a trend line
- Tap any factor to see the healthy range and where it comes from
- Body fat, BMI and muscle use Western reference ranges, not one-size-fits-all defaults
Health Age is a motivational estimate based on published research, not a clinical biological-age test.
4 years younger than your age
Example profile
Measure, then do something about it.
Most scale apps stop at the numbers. Everhale connects your scan to your goal, your food, your steps and your training, so every day has a clear next step.
A coach that does the maths
Your goal becomes daily numbers, each with the reason behind it. Calories start from the resting burn your scale measured, not a guess from your age.
- SMART goals with a safe weekly pace and a real date
- Progress chart against the plan, on track or behind
- A practical tip each day, and optional morning and evening reminders


Type it the way you'd say it
"2 eggs, toast with butter and a flat white." Everhale reads that and logs each food with a sensible portion. Or scan a barcode, snap a photo, or search 12,000 foods and dishes: butter chicken, fish and chips, ghormeh sabzi, pad thai. Packaged food not there? Search Open Food Facts from the same screen.
- Calories, protein, carbs, fat and 19 nutrients per meal and per day
- Kiwi foods understood: flat white, Weet-Bix, kūmara, mince
- Fasting timer, water, and weekly insights next to your scale changes


Your phone and watch, already counting
Steps, workouts, sleep and heart rate come in through Health Connect from Samsung Health, Google Fit, Fitbit and more. Nothing extra to wear.
- Move, Steps and Active rings with goals set by your plan
- Hour-by-hour steps, sleep stages and resting heart rate
- Food in against energy out, using your scan's resting burn
1,588 steps to go, about a 16-minute brisk walk.

A training plan that reads your scan
Tell it your days, your time and your equipment: gym, dumbbells at home or none at all. Everhale schedules each session, lights up the muscles it works, and shows how to do every exercise.
- Recovery days built in, and one line on why today's session serves your goal
- Step-by-step guides with moving illustrations for every exercise
- Weights go up only when you've earned it; personal bests flagged



Feel like you again, at a pace your body can take.
Tell Everhale how old your baby is, how they were born and whether you're breastfeeding. Your plan starts with recovery, then gets you back towards your pre-baby weight without putting your milk supply at risk.
- Recovery first: no calorie cutting before about 6 weeks, or 8 after a caesarean, and your postnatal check
- Breastfeeding adds the energy milk takes, about 500 kcal a day early on, and never drops below 1,800
- Gentle loss of about half a kilo a week at most, pelvic-floor reminders, and tips you can do while feeding
Not a new mum? Everhale also adjusts for pregnancy (stay active, no dieting), menopause (protect muscle and bone) and life after 60 (strength and balance first).
Join the waitlistEveryone gets their own plan.
Add each family member on one phone, or pair the scale from each person's own phone. The scale shows the right name on its screen, and every profile keeps its own goal, food diary, workouts and history.


- 4 foot electrodes in the glass
- 4 hand electrodes in the grips
- Colour screen on the bar
Shown in Midnight black and Deep teal. Product renders; final colours may vary slightly.
Hands and feet, for the whole picture.
A tempered-glass platform and a hand-held bar with its own colour screen. Bluetooth sends each scan straight to your phone, where the calculation runs.
- Electrodes
- 8 (hands and feet)
- Frequencies
- 20 kHz and 100 kHz
- Segments
- 2 arms, 2 legs, trunk
- Screen
- 3.5-inch colour
- Capacity
- 180 kg
- Precision
- 0.05 kg under 100 kg
- Connection
- Bluetooth to your phone
- Battery
- Rechargeable, 800 mAh
- Size
- 375 × 352 × 35 mm
- Extras
- Heart rate, named users on screen
Everhale is a wellness product, not a medical device. It does not diagnose or treat any condition.
Built in Auckland. Your body data stays on your phone.
No account, no cloud
Scans, food logs and goals are stored on your phone. We don't run a server that holds your health data, so there's nothing of yours for us to sell or lose.
Local support
A New Zealand company, U HEALTH LIMITED, answering in your time zone.
Honest numbers
Every target shows its reason and its source. Home scales are best at tracking change over time, and we say so.
How to weigh in so your numbers mean something.
Body-composition scales read how easily a tiny current passes through you. Water, food and recent exercise all change that. These five habits make one week comparable with the next.
Same time, same routine
First thing in the morning, after the bathroom and before you eat or drink.
Bare, dry feet and a full grip
Clean, dry feet on the plates and both handles held fully, so all eight contact points touch.
Skip it after a workout or sauna
Exercise, a hot shower, a big meal or alcohol shift your body water for hours.
Stand still, arms out
Straight arms, away from your sides, until the reading finishes.
Judge the trend, not the day
Look at the two-to-four-week trend before you change your plan. Everhale's charts do this for you.
Before you join
When can I buy one?
We're finishing the app and preparing our first New Zealand stock. Waitlist members hear the launch date and the founding-member price before anyone else.
Which phones does the app work on?
Android first, with iPhone to follow. Activity tracking uses Health Connect, built into recent Android phones.
Where is my data stored?
On your phone. There is no Everhale account and no cloud copy. Barcode lookups ask the free Open Food Facts database for the product name, and that's all that leaves your phone.
Can I use it after having a baby, or while pregnant?
Yes. Choose "Had a baby" or "Pregnant" in the app and your plan follows safer rules: recovery first after birth, no dieting in pregnancy. Body composition isn't measured during pregnancy; the scale weighs you only. Check exercise plans with your midwife or GP.
Is it safe for everyone?
Don't use body-composition measurement if you have a pacemaker or another implanted electronic medical device. You can still use the scale for weight only.
Is it a medical device?
No. Everhale is a wellness product for tracking your body over time. It doesn't diagnose or treat any condition. Talk to a health professional before making medical decisions.
Can my family use the same scale?
Yes. Each person has their own profile, goal and history, and the scale shows their name.
Everhale scaleFounding-member price
The Everhale scale and app.
NZ$279 NZ$349 GST included, free NZ shipping
- 8-electrode scale with hand bar and colour screen
- The Everhale app with every feature, no subscription
- 2-year warranty and 30-day returns
Pre-orders open soon. Join the waitlist and we'll email you first.
Be first on the scale.
Join the waitlist for the launch date, the founding-member price and early access to the app. One email when it matters.
